News

Curb Repairs Happening Throughout the City

Posted November 2, 2017 in Streets and Public Service by Anna Subler

You may have noticed construction work taking place on some local streets and sidewalks throughout the city. As a part of the 2017 Street Maintenance and Rehabilitation Program, contractors are currently repairing concrete curbs along 25 streets in preparation for street resurfacing. Crews are also adding ADA compliant curb ramps to various corner lots that will provide a safe transition from a roadway to a curbed sidewalk to those with disabilities. This work is expected to be complete before winter – however, it is dependent on weather.

Expect to see construction on the following streets:

  • Britton Farms Dr.
  • Heather Ridge Dr.
  • Hallwood Ct.
  • Hedge Row Ct.
  • Edgewyn Ave.
  • Patcon Wy.
  • Sturbridge Ct.
  • Haverfield Ct.
  • Huckleberry Ct.
  • Scarberry Dr.
  • Augustus Ct.
  • Lagoon Ln.
  • Outer St.
  • Berry Leaf Ln.
  • Dexter Ave.
  • Heywood Dr.
  • Coolbrook Dr.
  • Cutwater Ln.
  • River Narrows Rd.
  • Leemar Dr.
  • Linda Rd.
  • Wakefield Dr.
  • Hessler Cir.
  • Shire Cove Rd.
  • Shire Landings Rd.