Council approves 2025 street maintenance projects

Hilliard residents will see improvements on various residential streets throughout the community in the coming months.

Hilliard City Council on Monday approved about $4 million for the 2025 Street Maintenance and Rehabilitation Program. This comprehensive program provides funding for the City’s annual programmatic street maintenance and rehabilitation program.

The City currently maintains approximately 146 miles of streets and public parking lots/drives. 

This year’s program includes:

  •  Resurfacing portions of Alton Darby Road
  • Resurfacing and restriping at Heritage Lake Drive to add an on-street buffered bike lane
  • Resurfacing and restriping the northern portion of the HOSA parking lot on Scioto Darby Road
  • Micro-surfacing portions of Britton Parkway
  • Road pavement repairs on Hilliard Rome and Cemetery roads.

Work will take place from late spring until late fall.

The scope of work identified for the various streets is based on pavement condition ratings, average daily traffic, type of street, and budget.

In addition to the micro-surfacing project and 31 resurfacing projects, modifications will be completed at the roundabout at Britton Parkway and Hayden Run Road to install raised crosswalks to improve pedestrian safety and reduce vehicle speeds. Rumble strips will also be added to the east and west approaches, and the roundabout will undergo resurfacing, curb repairs, and restriping.

The 2025 SMRP contract calls for the use of recycled asphalt on some designated streets. Recycled asphalt pavement is a viable, cost-effective, and environmentally friendly product that reuses materials that would otherwise fill landfills.

Below is a list of all the streets that will be treated in 2025:

Resurface

  • Alton Darby Creek Road (Roundabout to Alton Darby Elementary School)
  • Heritage Lakes Drive (5782 Heritage Lakes Drive to end of cul-de-sac)
  • Parkway Lane
  • Parkway Court
  • Lyman Drive (Davidson Road to Anson Road roundabout)
  • Lyman Drive (Cemetery Road to Parkway Lane)
  • Franklin Street (Between Firefly Winery and Hilliard Civic & Cultural Arts Center)
  • Brown Park Drive
  • Cressinghurt Court
  • Brandamore Court
  • Silo Court
  • Davidson Run Court
  • Roger Allen Court
  • Thims Court
  • Patty Lane
  • Longview Drive
  • Claymill Drive (Heather Ridge Drive to Brickwood Drive)
  • Glenallen Court
  • Prairie Pine Court
  • Weaver Court North
  • Stoneybrook Court
  • Stonesthrow Court
  • Stonesthrow Court West
  • Stonesthrow Court East
  • Scioto Farms Drive (Scioto Chase Drive to Scioto Bend Drive)
  • Scioto Bend Drive
  • Junction Drive
  • Thorney Drive
  • Raven Court
  • Dirham Court
  • Barnhurst Lane

Micro-surfacing

  • Britton Parkway (Davidson to Hayden Run roads)

Related News

Hill farm II

City Council to review proposal to expand Hill Farm subdivision

Kenneth's Hair Salon and Day Spas Hilliard is moving its location at 3610 Fishinger Blvd. in Mill Run to the new $200 million mixed-use development on Trueman Boulevard.

Hilliard’s TruePointe adds Kenneth’s Hair Salons to tenant lineup

Kyle Plush Answer the call award winners

HPD sergeant, dispatchers awarded for ‘answering the call’

A boy diving into water
A boy blowing bubbles

Hilliard is happening! Find out what’s going on with our weekly newsletter.

Click the ‘x’ to opt out.